Civil and environmental engineering

Municipal Water Treatment

ClearFlow Engineering · Denver, CO · 2023

A major upgrade to Denver's municipal water treatment facility, doubling capacity while meeting new EPA standards for emerging contaminants.

The Challenge

The existing facility had to remain fully operational during the upgrade. New EPA requirements for PFAS removal required technology that had limited precedent at this scale.

Our Solution

We designed a phased construction approach with temporary bypass systems and specified a granular activated carbon treatment train — one of the first municipal-scale PFAS removal systems in Colorado.

The Result

Facility now serves 400,000 residents with treatment capacity doubled. Achieved full PFAS compliance 8 months ahead of the regulatory deadline.

Capacity
80 MGD
Residents Served
400,000
Budget
$65M
Duration
30 months
Compliance
Full PFAS
Type
Municipal Infrastructure
Scroll to Top